Service

Structured Cabling

Cat6/Cat6A copper, fibre optic, and pathway infrastructure — designed to standard, tested, and certified.

Our process

How we deliver results

1

Step 01

Site Survey & Pathway Planning

We map existing pathways, conduit routes, and ceiling/floor access to design the most efficient cable runs.

2

Step 02

Cable Plant Design

MDF/IDF layout, port counts, patch panel allocation, and labelling standards — all documented before a single cable is pulled.

3

Step 03

Cable Installation

Professional pulling, routing, and termination of Cat6/Cat6A copper and single-mode or multi-mode fibre optic cabling.

4

Step 04

Testing & Certification

Every cable run is tested with Fluke certification testers — results documented and delivered with the project.

5

Step 05

Labelling & As-Built Documentation

Consistent labelling on every port, patch panel, and cable, plus updated floor plans and rack elevations.

Why choose us

The Tofido difference

BICSI Standards

All cabling installed to BICSI and TIA/EIA standards — no shortcuts, no exceptions.

Future-Proof Infrastructure

Cat6A and fibre installations rated for 10Gbps+ ensure your cabling supports tomorrow's bandwidth demands.

Clean & Organised

Professionally routed and managed cable runs that simplify troubleshooting and future moves/adds/changes.

Certified Test Results

Every run Fluke-tested and certified — full test reports included with project handover.